Mechanical and Structural Engineering Contracting
Heavy Metal Fabrication
Tel: (230) 208 6463 Email: maxworks@intnet.mu
Project Gallery
Project Highlights
Conversion and painting of EX-MCFI ammonia tanks A & B for heated HFO 380 storage, including new pumping station and heating system. Refurbishment and upgrading to Total and API650/653 standard. Please browse gallery for more project details.
Removal of external insulation and internal insulated suspended roof. Modification of all shell and roof nozzles Design and installation of tank internal heating coils and draw-off heater and interconnecting pipework to hot oil boiler
Internal and external surface preparation and coating of the tanks. Design and construction of roof inter-connecting bridge to tie 2 tanks. Construction of bund walls and interconnecting pipework to existing distribution and reception pipework in port area.
Conversion and painting of EX-MCFI ammonia tanks A & B for heated HFO 380 storage, including new pumping station and heating system. Refurbishment and upgrading to Total and API650/653 standard. Please browse gallery for more project details.
Electro-mechanical works for Phase-1 of CEB power station at Pointe Monnier, Rodrigues. Please browse gallery for more project details
Installation of the whole electro-mechanical works for the 2 diesel sets for Phase-1 . Included fuel system, cooling system, control pipework, erection of a 330m3 HFO storage tank, fuel filtering, system, pipe racks, installation of service overhead travelling crane for the engines, erection of chimney stack, design and construction of fire-fighting tank and related systems. Supply and installation of HFO transfer pumps with controls from Port-Mathurin tank farm.
Electro-mechanical works for Phase-1 of CEB power station at Pointe Monnier, Rodrigues. Please browse gallery for more project details
Design and construction of 5000m3 HFO tank to API 650 at F.William for CEB Please browse gallery for more details.
Design and construction of a 5,000m3 HFO tank, including inter-connecting pipework to existing tanks. Turnkey project with all civil and concrete works, tank foundations, bund wall modifications, impressed current cathodic protection system.
Tank erected by “jack-up” method, and project completed in record time of 6 months. Also included retro-fitting of tank gauging instrumentation to adjoining existing tank.
Design and construction of 5000m3 HFO tank to API 650 at F.William for CEB Please browse gallery for more details.